БЛОГ

May 29, 2016

It took just 17 days to create world’s first 3D office in Dubai [video]

Posted by in categories: 3D printing, robotics/AI

Awesome.


The 3D-printed office was constructed using a special mixture of cement and a set of building material designed and made in the UAE and the United States. To ensure reliability, the materials have undergone a range of tests in both China and the United Kingdom.

A 3D-printer measuring 20-feet high, 120-feet long and 40-feet wide was used to print the building that featured an automated robotic arm to implement printing process.

Read more

Comments are closed.