БЛОГ

Oct 13, 2022

The US’ first wind-solar-battery project is now online and can power around 100,000 homes

Posted by in category: energy

Portland General Electric.

Located in northern Oregon, the renewable energy facility comprises 30 megawatts of massive lithium batteries that can store up to 120 megawatt-hours of power, generated by the 300-megawatt wind farms and 50-megawatt solar farm, powering around 100,000 homes.

Comments are closed.