Feb 12, 2012
CERN’s annual Chamonix-meeting to fix LHC schedules (Feb. 6–10 2012): Increasing energies. No external and multi-disciplinary risk assessment so far. Future plans targeting at Mega-LHC.
Posted by LHC Kritik in categories: cosmology, engineering, ethics, events, existential risks, particle physics, physics, scientific freedom, sustainability, transparency
Info on the outcomes of CERN’s annual meeting in Chamonix this week (Feb. 6–10 2012):
In 2012 LHC collision energies should be increased from 3.5 to 4 TeV per beam and the luminosity is planned to be highly increased. This means much more particle collisions at higher energies.
CERN plans to shut down the LHC in 2013 for about 20 months to do a very costly upgrade (CHF 1 Billion?) to run the LHC at 7 TeV per beam afterwards.
Future plans: A High-Luminosity LHC (HL-LHC) is planned, “tentatively scheduled to start operating around 2022” — with a beam energy increased from 7 to 16.5 TeV(!).